PROJECT
MANAGEMENT PROFESSIONAL (PMP)
S/N
|
PROJECT
TOPICS
|
1.
|
Design a
Project Plan for the procurement of business property for an organization
(Hint: The project should consist of all Legal procedures for property
acquisition).
|
2.
|
Design a
project plan for setting up a firm of your choice.
|
3.
|
Choose any
event of your choice, design a feasible and executable project plan of the
said project.
|
4.
|
Design a
feasible project plan in any of the following areas: Fish farm, Poultry farm,
Plantain Plantation and Palm Plantation.
|
5.
|
Design a
project plan for the execution of a 20KM road awarded by Etisalat Nigeria to
your Local Government.
|
6.
|
Design a project
plan for the planning, procurement and maintenance of an ATM in any bank
branch of your choice.
|
7.
|
Design a
project plan for effective skill acquisition for Nigeria youths
|
8.
|
Design a
simple 11KV/0.415KV/0.220KV Power Distribution Network for any Filling
Station of your choice. (Get the total load of the filling station and size
your transformer, cables and switch yard).
|
9.
|
Design a
feasible business plan on any business of your choice executable at start-up
of
|
10
|
Design of an
effective project plan for waste Management in Nasarawa State.
|
11.
|
Develop an
effective curriculum for basic education in any state of your choice in
Nigeria.
|
12.
|
Design a feasible project plan for enhancing
primary school education in Nasarawa State.
|
13
|
Design of
project plan for the development of a traffic monitoring software in any city
of your choice.
|
Note:
1. If
you choose any project topic:
a. Call
070 6262 8598 or 080 3921 7371 for topic confirmation.
b. Send
your name and project topic to: 080 3921 7371.
General Hint:
1. The
projects must consist of the scope, budget, resources and time bond.
2. The
project thesis should be arrange in the order below:
a. Chapter
one – Introduction.
b. Chapter
two – Literature Review (Relevant ones).
c. Chapter
three – The design and methodology. This will include the main plan of the
project that is scope, schedule, budget, resourcing.
d. Chapter
- Result (print out) from project management software and its analysis.
e. Chapter
four – Summary, Recommendation and Conclusion.
f. References.
INDUSTRIAL HEALTH, SAFETY AND
ENVIRONMENT (IHSE)
S/N
|
PROJECT
TOPICS
|
1
|
Design a
safety plan for a proposed start-up company in any area of your choice.
|
2
|
Present a
safety report on road accident cases on any state of your choice, stating the
psychological and social-economic impact on Nigeria and Nigerians.
|
3
|
Design a
stress management system for a financial institution
|
4
|
Design a waste
management system for any state of your choice.
|
5
|
Design safety
training for any organisation of your choice, highlighting the impact of
safety training to business growth and development.
|
6
|
Design safety
an environmental impact assessment report in any company of your choice.
(Hint: areas to be considered – construction, food and beverages,
manufacturing and Telecommunication companies)
|
7
|
Design a
proactive safety management system in any of the following companies:
Electrical, Oil and Gas, medical and chemical companies
|
8
|
Conduct a
strategic risk assessment in any firm of your choice
|
9
|
Design a
safety, awareness, sensitization program for the need of safety integration
in Nigeria economic affairs
|
Note:
1.
If you choose any project topic:
a.
Call 070 6262 8598 or 080 3921 7371
and tell him your name and topic for confirmation.
b.
Send your project topic and name to
080 3921 7371.
General Hint:
1.
The projects must consist of the
scope, budget, resources and time bond.
2. The
project thesis should be arrange in the order below:
a. Chapter
one – Introduction.
b. Chapter
two – Literature Review (Relevant ones).
c. Chapter
three – The design and methodology. This will include the main plan of the
project that is scope, schedule, budget, resourcing.
d. Chapter
four – Summary, Recommendation and Conclusion.
e. References.
INTERNATIONAL
CUSTOMER RELATION MANAGEMENT (ICRM)
S/N
|
PROJECT
TOPICS
|
1
|
Design of an
effective customer retention program for any company of your choice.
|
2
|
Design an
effective marketing strategy for sales improvement in any company.
|
3
|
Conduct a
qualitative research on the sustainable relevance of effective customer
relationship strategies for sustainable business growth and development.
|
4
|
Design a
project for setting up a call centre for any firm of your choice.
|
5
|
Effective
customer satisfaction strategy for sustainable business growth and
development.
|
6
|
Design a
customer value creation chain for any product or service of your choice.
|
7
|
Impact of Information-Communication
Technology to customer relation program for sustainable business growth and
development.
|
Note:
2.
If you choose any project topic:
c.
Call 070 6262 8598 or 080 3921 7371
and tell him your name and topic for confirmation.
d.
Send your project topic and name to
080 3921 7371.
General Hint:
3.
The projects must consist of the
scope, budget, resources and time bond.
4. The
project thesis should be arrange in the order below:
f. Chapter
one – Introduction.
g. Chapter
two – Literature Review (Relevant ones).
h. Chapter
three – The design and methodology. This will include the main plan of the
project that is scope, schedule, budget, resourcing.
i.
Chapter four – Summary, Recommendation
and Conclusion.
j.
References.
GLOBAL
HUMAN RESOURCE MANAGEMENT (GHRM)
S/N
|
PROJECT
TOPICS
|
1
|
Design of an
effective Human Resource Management plan for any start-up firm of your
choice.
|
2
|
Commitment and
engagement as effective tools of motivation in any company of your choice.
|
3
|
Design a
project plan for strategic recruitment and selection for any company of your
choice.
|
4
|
Using any
company of your choice, research on relevant of job design, organisational
culture and organisational behaviour to high performance growth and
development.
|
5
|
Design a
talent hunt program for a multi-national company in Nigeria ( e.g: Coca cola,
Guinness, Maltina, Gulder, Star, MTN, GLO, Airtel and Etisalat.
|
6
|
Design a
co-operate social-responsibility program of any company of your choice.
|
7
|
Design a human
capital development program for any company of your choice, using the report
on needs assessment as the basis.
|
Note:
3.
If you choose any project topic:
e.
Call 070 6262 8598 or 080 3921 7371
and tell him your name and topic for confirmation.
f.
Send your project topic and name to
080 3921 7371.
General Hint:
5.
The projects must consist of the
scope, budget, resources and time bond.
6. The
project thesis should be arrange in the order below:
k. Chapter
one – Introduction.
l.
Chapter two – Literature Review
(Relevant ones).
m. Chapter
three – The design and methodology. This will include the main plan of the project
that is scope, schedule, budget, resourcing.
n. Chapter
four – Summary, Recommendation and Conclusion.
o. References.
Contacts:
Office 1: No. 3, Durban Street, Wuse 2, Abuja.
Office 2: Famisah Plasa, Along Wamba Road, Akwanga, Nasarawa State.
Telephone: , , +2347018705699.
Email Address(es): contactadmin@iipmi.org; customer@iipmi.org; iipmnigeria@gmail.com